On-Line Roadmarking Road marking specialists · est. 1994
Fresh white chevron and arrow road markings on dark asphalt
Ref: ORM-1994 · BS EN 1436 · TSRGD compliant

We are the road marking experts.

Specialist equipment, fully trained crews and a reputation for reliability, permanent and temporary road marking, car parks, anti-skid and line removal across Beds, Bucks, Herts, London and the South East.

Get a free quote Explore services
30+
Years on the road
1,483
Projects awarded & delivered
24/7
Night & off-peak working
DunstableRedbournSt AlbansHarpendenLutonHemel HempsteadWatfordLondonMilton KeynesBedfordAylesburyOxfordLeighton BuzzardStevenageNorthamptonHigh WycombeCambridgePeterboroughLeicesterCoventryBirminghamNottinghamReadingSwindonBristolSouthamptonManchesterLiverpoolLeedsSheffieldNewcastleCardiffSwansea

About us · Est. 1994

Precision on every surface.

On-Line Roadmarking Ltd are specialists in every aspect of ground marking. We take an old-fashioned pride in the quality of our lines, because a marking is a safety device, and it has to be right first time.

No job is too large or too small. From a single disabled bay to a full logistics-yard scheme, we complete every project on time, on budget and to a standard we are happy to photograph, batch-record and hand over. Our materials are chosen for the surface and the weather it will face, not for the margin on the tin.

  • NVQ Level 2 qualified operatives, CSCS-carded, SSSTS-supervised
  • Markings dimensioned to TSRGD and performance-tested to BS EN 1436
  • Night, weekend and term-time programming around your operation
  • Photographic handover records and material batch data as standard
More about us
30+
Years on the road
789
Road marking restoration projects
465
Car park restoration projects
166
Sports & playground projects

How we work · 4 steps

Measured. Specified. Marked. Proven.

01

Survey & measure

A site visit or desktop review, then a CAD layout with bay counts, dimensions and materials stated explicitly. You sign off the drawing before we quote final.

02

Specify & programme

Materials specified to BS EN 1436 against your traffic load. Night, weekend and term-time programming agreed around your operation, not ours.

03

Prepare & apply

Surface preparation first, always. Then screed, extrusion, spray or preform application by NVQ-qualified, CSCS-carded crews with SSSTS supervision.

04

Verify & hand over

Retroreflectivity and coverage checked on completion. Photographic records, batch data and maintenance guidance issued with every handover.

Latest work · On site now

Fresh off the machine

See the results
Freshly applied white zig-zag road markings on new asphalt New zebra crossing stripes laid by our crew Colour-coated sports court with crisp white court lines Self-propelled line marking machine applying a thermoplastic line

Accreditations & workforce credentials

CHASAccredited contractor
ConstructionlineGold member
CSCSCarded workforce
NVQ Level 2Qualified operatives
SSSTSSite supervisors
NHSS 12DTraffic management

Testimonials

What clients say

They re-lined our entire distribution yard across four nights and we never lost a shift. The photographic handover pack alone was worth the fee, our insurers loved it.
Operations ManagerNational logistics operator, M1 J9
The school council designed it, On-Line drew it, and by September the playground had a daily-mile track the children actually use. Three years on it still looks new.
HeadteacherPrimary school, Harpenden
Six hundred bays re-planned, re-lined and reopened before Monday trade, twice. They are the only marking contractor on our term framework for a reason.
Facilities ManagerRetail park, St Albans

Ref: QUOTE-24 · Free site survey

Let's mark it properly.

Tell us the site, the surface and the deadline. We'll come back with a measured price and a programme, usually within 24 hours.

Get a free quote 01525 210245